Opening Hours: Mon-Fri 8am-5pm

  • DeAar, Northern Cape
  • 6-8 Weeks

Environmental Impact

3 602

Litres of Gasoline

29 541

Trees Saved

5 455 001

Litres of Fuel

What makes this project different?

KYTO is a leading supplier in organic, free range and Halaal lamb meat in South Africa. They specialize in the sourcing, processing, purchase, slaughter, marketing, sales and distribution of lamb & mutton to high end retail, wholesalers and consumers on national and international level. Their major clients being Checkers and Woolworths in South Africa.

KYTO also exports produce internationally with abattoirs in Groblershoop and De Aar, situated in the Northern Cape, South Africa.

The company has a culture of ‘sustainable farming for the future’ and business decisions are driven on an environmental footprint of responsibility both locally and globally as a large portion of their products are exported to international markets.

Kyto solar PV installation

“We focus on the organic market, supplying verified organic lamb to Woolworths Free Range and Checkers Certified Natural product lines. We look at using compostable trays instead of plastic, we look at our packaging responsibility and water use. Going solar fitted in with our company vision and brand statement.  Our decision to choose The Energy Gurus over the other solar proposals we received were based on a few factors; their technical expertise was unmatched; the feedback and communication was excellent and the project was delivered as promised”

Alex Cilliers

Managing Director, Kyto Abattoir

Project Timeline and Equipment

The 475kW system was installed during a 6-8 week timeline which included many thousands of KM’s traveled to and from site:  
  • 1077 ART Solar 410W panels installed – 192 of these panels were installed in a uniquely engineered ground mount system
  • 8 GoodWe Inverters (5 x 80kW and 3 x 25kW)
  • 400kVA generator installed within 8 days
  • Large Kwikot industrial geyser replaced a 20+ year old boiler in the plant
  • 1 year service level agreement, 15 year warranty on inverters & 25 year warranty on all panels
Kyto solar PV ground mount installation

Head of the project design, Carel Ballack, further explains the installation in detail:

“Personal consultation with the client meant we understood and could address challenges faced by the business. We identified critical opportunities and supported the solutions with logical steps and measurable results. Areas to be addressed were; power security, increasing costs and inefficient equipment.”

– Power security:

  • During the assessment phase, the business was exposed to an extended period with no power and a 400kVA generator was installed and commissioned within 8 days.

– Efficient Equipment:

  • A 20+ year old boiler in the plant was replaced by a large industrial geyser that heated up in a quarter of the time and the biggest difference of course being no more headaches around boiler breakdowns and the costs involved thereof.

– Financial Sustainability:

  • A 475kW Grid-tied solar system was installed during a 6-8 week timeline which included many thousands of KM’s traveled to and from site.
  • The solar system consisted of 1077 ART Solar 410W panels of which 192 of these panels were installed on a uniquely engineered ground mount system.
  • 8 GoodWe Inverters (5 x 80kW and 3 x 25kW) 1 year service level agreement, 15 year warranty on inverters & 25 year warranty on all panels.
Carel Ballack

Head of Project Design, The Energy Gurus

“What I enjoyed about this project was creating the one of a kind ground mount system we had to design and engineer as there wasn’t sufficient roof space for all the solar modules. 192 of the modules were installed on an engineered aluminium base taking into consideration the type of ground and soil it was built on. There were services running underground and hence we could not drill or dig trenches”

Adriaan Ballack

Project Manager, The Energy Gurus

9 months after the installation we spoke to Kobus Van Coller, Kyto Financial Director, who further explains how the decision has affected their finances:

“Our initial decision was to curb inflation; investment into our production security meant that we could model the capex on the basis of a long term commitment.  To date, the modelled solar generation  has been fairly accurate. An original payback term of between 5-7 years with even greater savings from year 3 onwards. We are happy to say we are still on track to meet those terms with all the added benefits that Alex stated previously. Post the solar and other energy efficiency solutions being implemented, our monthly electricity bill has been reduced by approximately R50 000.00 per month, adding to the actual massive annual inflation to our cost of energy going forward.”

Kobus Van Coller

Financial Director, Kyto Abattoir

Disclosure

The Energy Gurus are a South African engineering firm specializing in energy measurement, power quality and renewable solutions. We guide our clients through every step of their energy journey, from initial consultations and system design to installation, maintenance, and ongoing support. Our end-to-end solutions ensure a seamless experience and maximum return on investment for our valued customers.

We measure, analyse and then recommend what is best for the company or end user. We have successfully carried out many turnkey EPCM contracts in the energy sector which makes us flexible to align different service offerings depending on the specific projects’ requirements.

Our engineers consult with our clients to define exactly what is it that they need to start reducing their monthly energy expenditure and costs from day 1.